[1]
Afrida, W.D. et al. 2025. Comparative Analysis of Time and Cost Efficiency in Project Acceleration Strategies: A Case Study of the Construction of a Police Service Building. Global Education Journal. 3, 1 (Aug. 2025), 211–217. DOI:https://doi.org/10.59525/gej.v3i1.288.