Evaluation Earned Value Management for Teaching Time and Cost Performance in Civil Engineering Education

Authors

  • Andrian Firdaus Yusuf al Qordhowi Sunan Giri University, Surabaya, Indonesia

DOI:

https://doi.org/10.59525/gej.v3i1.1203

Keywords:

Civil Engineering Education, Construction Management Education, Earned Value Management, Project-Based Learning, Time and Cost Performance

Abstract

The alignment between civil engineering education and industry demands requires learning models that effectively integrate theoretical knowledge with real project-based analytical skills. In construction management courses, students are expected to master not only conceptual frameworks but also practical tools for evaluating project performance. This study aims to examine the effectiveness of integrating construction management techniques particularly Earned Value Management (EVM) into civil engineering education by using river embankment development projects as authentic learning case studies. The research adopts a quantitative evaluative approach with an explanatory design, involving undergraduate civil engineering students enrolled in construction management courses. Learning outcomes were assessed through students’ ability to analyze time and cost performance using key EVM indicators, including Schedule Performance Index (SPI), Cost Performance Index (CPI), and Estimate at Completion (EAC). The results indicate that the use of real infrastructure project cases significantly enhanced students’ analytical competence in identifying schedule delays, cost inefficiencies, and their interdependencies. However, the findings also reveal limitations in students’ capacity to propose adaptive corrective strategies, reflecting gaps between analytical understanding and decision-making skills. The study concludes that integrating construction management techniques through project-based learning strengthens cognitive and applied learning outcomes but requires complementary pedagogical strategies to foster higher-order problem-solving abilities.

References

Acebes, F., Pereda, M., Poza, D., Pajares, J., & Galan, J. M. (2024). Stochastic Earned Value Analysis Using Monte Carlo Simulation and Statistical Learning Techniques. arXiv. https://arxiv.org/abs/2406.02589

Al Qordhowi, A. F. Y. (2021). Analysis of the Implementation of Bridge Construction Project Risk Management. Enrichment: Journal of Management, 12(1), 957-964.

Al Qordhowi, A. F. Y. (2025). The Use of Agile and Scrum Methods in the Implementation of Advertising Media Construction Projects Reviewed from Time Limitations and Project Locations Adjacent to Cultural Heritage Buildings. Electronic Journal of Education, Social Economics and Technology, 6(1), 663-673.

Andreas, A., Tinumbia, N., & Anggraini, E. (2023). Construction Project Control Analysis Using EVM, ESM, EDM: Highrise Building Project in Jakarta. Jurnal Infrastruktur, 9(2), 4943. https://doi.org/10.35814/infrastruktur.v9i2.4943

Anwar, M., Kurniyaningrum, E., Pontan, D., & Innavona. (2025). Evaluation Of Cost And Time Performance Control Using The Concept Method Of Earned Value In The Purwodadi Market Development Project. Eduvest – Journal of Universal Studies, 4(11), 49920. https://doi.org/10.59188/eduvest.v4i11.49920

Fardila, D., Kamagi, S. N. R., Topan, P. A., & Husainy, Z. (2025). Cost and Time Analysis of Road Improvement Projects Using the Earned Value Method. Hexagon, 5(2), 4044. https://doi.org/10.36761/hexagon.v5i2.4044

Fleming, Q. W., & Koppelman, J. M. (2016). Earned Value Project Management (4th ed.). Project Management Institute. (book, foundational)

Kerzner, H. (2022). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (13th ed.). Wiley. (book)

Khoshkonesh, A., Mohammadagha, M., & Ebrahimi, N. (2025). Integrated 4D/5D Digital-Twin Framework for Cost Estimation and Probabilistic Schedule Control. arXiv. https://arxiv.org/abs/2511.15711

Lazuardi, F., & Rizki, M. A. (2025). Project Cost and Time Performance Analysis Using Earned Value Concept Method in Building Shophouses in Papua. JRST, 10(1), 25969. https://doi.org/10.30595/jrst.v10i1.25969

Malingkas, G. Y. (2025). Time and Cost Management Analysis Using SPI and CPI in Health Center Construction Project. Journal of Social Research, 4(10), 2734. https://doi.org/10.55324/josr.v4i10.2734

Nazaruddin, N., Nugroho, L. D., & Muhammadun, H. (2025). Project Performance Analysis Based on Earned Value Method on Infrastructure & Infrastructure Improvement of Yohanis Kapiyau Timika Airstrip. Asian Journal of Social and Humanities, 3(4), 479. https://doi.org/10.59888/ajosh.v3i4.479 ajosh.org

Pratiwi, A. N., Prihadi, W. R., & Al-Pashya, M. D. R. (2025). Cost and Time Performance Evaluation of a Sports Hall Construction Project Using the Earned Value Method. INERSIA, 21(1), 84089. https://doi.org/10.21831/inersia.v21i1.84089

Rahmadani, L. P., Susanti, J. E., & Dwiyana, P. A. (2025). Cost and Time Performance Evaluation Based on Earned Value Analysis Method. Journal of Civil Engineering and Planning, 6(1), 10691. https://doi.org/10.37253/jcep.v6i1.10691

Reda, S. G., Belachew, K. T., Demiss, B. A., & Ali, S. K. (2025). Performance Evaluation of Construction Project by Earned Value Management System in Water Works Construction. Discover Civil Engineering, 2, 25. https://doi.org/10.1007/s44290-025-00193-0

Sadeghi, S. (2024). Enhancing Project Performance Forecasting Using Machine Learning Techniques. arXiv. https://arxiv.org/abs/2411.17914

Sasmita, A. (2024). Analisis Kinerja Proyek Konstruksi Menggunakan Metode Earned Value. Jurnal Ilmiah Global Education, 5(3), 3411. https://doi.org/10.55681/jige.v5i3.3411

Silitonga, V., Khalifah, V. A. S., & Fansuri, M. H. (2025). Controlling Cost and Time Progress Using Earned Value Analysis Method for Building Projects. Journal of Research and Innovation in Civil Engineering as Applied Science (RIGID), 4(2), 1877. https://doi.org/10.58466/rigid.v4i2.1877

Soliman, E., Alrasheed, K. A., Alghanim, S., & Morsi, E. (2024). Integrating Risk Management and Earned Value Framework to Detect Early Warning Signs – Case Study. Journal of Engineering Research, https://doi.org/10.1016/j.jer.2024.05.029

Sussendyo, D. J., & Hariani, M. L. (2025). Performance Evaluation of Urban Transportation Projects. Journal of Research in Civil Engineering. https://doi.org/10.58466/rigid.v3i2.1878

Widyarso, R., Witjaksana, B., & Purnama, J. (2025). Analysis of Time and Cost Performance in Construction Projects Using the Earned Value Management Method. Asian Journal of Engineering, Social and Health, 4(4), 590. https://doi.org/10.46799/ajesh.v4i4.590

Downloads

Published

2025-12-30

How to Cite

al Qordhowi, A. F. Y. (2025). Evaluation Earned Value Management for Teaching Time and Cost Performance in Civil Engineering Education. Global Education Journal, 3(1), 531–539. https://doi.org/10.59525/gej.v3i1.1203

Similar Articles

<< < 1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.